Contractor Health and Safety Requirements
ESS Management of ContractorsContractor Health and Safety Requirements
- Contractor Health and Safety Requirements (Word: 1.2MB) -
- GN200 Contractors Induction Booklet Rev 22 June 2022
- ESS Management of Contractors(Word: 1MB) -
- Stage 1 Form A (Word: 1MB) -
- Stage 1 Form B (Word: 1MB)
- Stage 2 (Word: 1MB)
- Protecting the Public - Works Segregation
Construction Site Inspection
- Workplace Inspection Procedure and Form (Word: 30KB)
Contractor Parking
- contractor parking arrangements reviewed February 2020.doc
- Contractor Parking Application Form (PDF: 182KB)
- Project Handover Safety Critical List
Permits to Work, Isolation Procedures and Safe Systems of Work
- Confined Space Risk Assessment and Permit (PDF: 220KB)
- Electrical Isolation Procedure (PDF: 21KB)
- Electrical Live Working Procedure (PDF: 22KB)
- Fume Cabinet/Safety Cabinet/ Lab Drain Permit (PDF: 148KB)
- high voltage substation limitation-of-access and safe system of work.doc 2019
- Hot Work Permit 2019.docx
- Mechanical Isolation Procedure Domestic Hot Water Systems (PDF: 23KB)
- Mechanical Isolation Procedure Heating and Ventilation (PDF: 22KB)
- Oxy/Acetylene checklist (Word: 15KB)
- Permit to Dig May 2019.doc
- Roof Access Permit 2021
- Walk in Duct Entry Permit Rev 4, May 2019.doc
- Sanction to Work Near Live Conductors
Refurbishment Works
ESS Health and Safety Policy
Project Briefing Documents
01 General
Section 1 - General Building Design Guide.pdf
02 Mechanical
Section 2 Mechanical Services Design Guide.pdf
Control and Management of Legionella Rev5.pdf
Current Gas Safety Management System.pdf
03 Electrical
Section 3 Electrical Services Design Guide.pdf
NUIT CCS CAT6 6A Cable Specification V6.00.docx
Appendix B Hearing Assistance Systems.pdf
04 Lifts - Lift Consultancy ITT
Section 4 Lift consultancy specification.docx
05 Landscape
Section 5 Landscape specification.pdf
06 Asbestos (see Asbestos Management Plan)
GN 201 Asbestos Safety Management note.docx
GN 202 DOC A Survey Audit Form March 2017.docx
GN 203 DOC B Asbestos Method Statement Audit - Version 1 March 2017.docx
GN 204 DOC C Analyst 2017 V1.docx
Section 6 Asbestos Management Plan Jan 2017.pdf
07 Sustainable Construction Guide
Sustainable Construction Guidance_Dec 2017.pdf
08 BMS Specification
BEMSEngineeringSpecificationV12.docx
09 Metering Specification
Section 9 Metering Specification.pdf
10 Out of Hours Spaces Briefing Note
Section 10 Design principles for out of hours study spaces.pdf
Protecting the Public - Works Segregation
Lifts
Landscape
Asbestos